Why Getting Contractor Bids Too Early Can Cost You More




You’ve decided it’s finally time to renovate. You have ideas saved, a growing wish list, and perhaps a general sense of what you want to spend. Naturally, the next step seems obvious: call three contractors, collect three bids, and compare the numbers.

That sounds like a responsible approach. But if the design and scope haven’t been clearly defined, those bids may not give you the information you think they do.


A contractor can only price what has been decided. When important details are still unknown, the estimate must be built around assumptions, allowances, and exclusions. Each contractor may make different assumptions—which means you aren’t comparing three prices for the same renovation.


You may be comparing three entirely different projects.


A Bid Can Look Precise Without Being Complete

A renovation estimate may contain detailed line items and a very specific total. That can make the number feel firm and reliable. But the accuracy of that estimate depends on the information the contractor received.


“Renovate the kitchen” isn’t a defined scope. It leaves dozens of important questions unanswered:


  • Will the existing layout remain, or will plumbing and electrical locations change?
  • Will the cabinetry be stock, semi-custom, or custom?
  • Are the existing floors being repaired, refinished, or replaced?
  • Will new flooring continue into adjoining rooms?
  • Are the appliances staying in their current locations?
  • Does the lighting plan involve replacing fixtures or relocating electrical boxes and adding circuits?
  • Will the backsplash be standard tile, handmade tile, or a full-height slab?
  • Are painting, trim, transitions, permits, and disposal included?


These aren’t merely decorative decisions. They affect labor, materials, scheduling, trade involvement, and overall construction cost.


When those details are missing, each contractor has to fill in the blanks. One may assume you’re keeping the existing layout while another includes moving the sink and appliances. One may include semi-custom cabinetry while another carries a lower cabinet allowance. One may anticipate significant electrical work while another excludes it until the design is finalized.

Both contractors may be acting honestly. They simply aren’t pricing the same project.


The Lowest Bid May Contain the Most Unknowns

Homeowners are often warned not to automatically choose the lowest contractor bid. But the reason isn’t necessarily that the least expensive contractor provides lower-quality work.


Sometimes, the lowest estimate is simply the one carrying the fewest costs.


One contractor may include painting, debris removal, floor protection, permit fees, delivery coordination, and repairs to surrounding finishes. Another may leave several of those items out or treat them as costs to be determined later.

The total at the bottom of the page doesn’t tell you that.


Before comparing prices, compare what each price includes. Look carefully for exclusions, qualifications, and language such as:


  • By owner
  • Not included
  • To be determined
  • As needed
  • Price pending selection
  • Additional cost if required


These phrases aren’t automatically red flags. Some unknowns are unavoidable in renovation, especially before walls are opened. But they do tell you which costs have not yet been resolved.


A lower initial estimate doesn’t necessarily mean a lower final cost.


Understanding the Allowance Trap

Allowances are another reason early bids can be difficult to compare.


An allowance is an amount included as a placeholder for something that hasn’t been selected or fully defined. Contractors commonly use allowances for cabinetry, countertops, tile, lighting, plumbing fixtures, hardware, appliances, or other finish materials.


Allowances are a normal part of many construction estimates. The problem arises when homeowners interpret an allowance as a reliable prediction of what their selections will actually cost.


Imagine that one contractor includes an $8,000 countertop allowance and another includes $15,000. At first glance, the first contractor’s bid appears to be $7,000 less expensive.


But if the countertop material, fabrication, edge details, sink cutouts, installation, and other requirements ultimately total $15,000, that apparent savings never existed. The first estimate was lower because it temporarily carried a smaller number—not because the finished countertop would cost less.


The same issue can occur with tile. An allowance may cover the tile itself but not the additional labor associated with an intricate pattern, specialty trim, uneven handmade material, a curbless shower, a recessed niche, or full-height installation.

The product price is only one part of the cost. The design often determines what will be required to install it.


When Should You Involve a Contractor?

Planning first does not mean contractors should be excluded until every last finish has been selected.


A qualified contractor can be extremely valuable early in the process. They can assess feasibility, identify possible construction challenges, flag structural or permitting concerns, and help establish a preliminary investment range.


The important distinction is between an early conversation and a meaningful construction bid.

Early in planning, you may be asking:


  • Is this renovation generally feasible, and what level of investment should we anticipate?

Later, once the design and scope are developed, you can ask:

  • What will it cost to build this specific renovation?


Those are different questions, and they produce different kinds of answers.


What Should Be Defined Before Requesting Bids?

You do not need to select every cabinet knob or paint color before talking with contractors. But the decisions that meaningfully affect construction and cost should be sufficiently developed.


Depending on the project, that may include:


  • A clear description of the rooms and work included
  • The proposed layout
  • Known wall, door, or window changes
  • Cabinetry configuration and general quality level
  • Major appliance selections or specifications
  • Plumbing locations and fixture requirements
  • Lighting and electrical intent
  • Flooring scope and transitions
  • Primary countertop and tile direction
  • Areas to be painted or refinished
  • Materials or features that will remain
  • Responsibility for purchasing and delivery
  • Any known structural, permitting, or access concerns


The more consistently this information is presented, the more useful the contractor pricing will be.

It also gives contractors the opportunity to ask better questions, identify missing details, and clarify their scope before construction begins—rather than discovering those gaps after demolition.


Better Information Creates Better Bids

The goal of planning isn’t to make renovation more complicated. It’s to organize the complexity before it becomes expensive.

When contractors receive a clear scope and design direction, their estimates are easier to evaluate. You can see where the numbers truly differ, understand what is included, and make a decision based on more than the total at the bottom of the page.

Planning also helps uncover potential conflicts while they are still relatively easy to solve. An appliance size can be coordinated with the cabinetry. A flooring transition can be considered before demolition. A plumbing fixture can be checked against the wall construction. A lighting location can be coordinated with the cabinet plan.


These may seem like small details, but together they shape the budget, the schedule, and the finished result.

Because the best time to solve a renovation problem is before it reaches the jobsite.


Start With a Thoughtful Plan

At Second Story, every project begins with a Renovation Roadmap. This focused planning process helps clarify your goals, priorities, potential challenges, investment, and the level of design support your renovation may require.

From there, we can develop the information needed to help contractors understand what they are being asked to build—and help you compare their pricing with greater confidence.


You don’t need to have every answer before reaching out. You simply need a thoughtful place to begin. Let's being your next chapter!

By Stacey Drimmer December 1, 2023
Many moons ago my dad bought my mom a little cabin in the woods in the southern tier of NY. It was a dump with potential and lots of spiders. No matter, she said. She was going to make this place beautiful. She sat us down at the kitchen table with graph paper and a pencil, and with many Sunday evening episodes of This Old House under our belt, she gave us each a room assignment. I designed the dining room. My sister designed the kitchen. Mom designed the living room and so on. I was 8 years old at the time but that didn’t stop my excitement. I loved designing with her! She was really good at it and helped me grow my confidence in it too. Construction didn’t intimidate her. She had a full fledged tool box and could fix just about anything that broke in and around our house. Toilets. Faucets. Drywall. Appliances. Landscaping. The pool filter. While I was never fond of toilet repair, I definitely caught the remodel and design bug from her. She was always the superhero home decorator with an amazing eye for design and detail and color and space. She loved making her house a home. In 2009 we lost my Mom, yet she’s still such a profound influence. I find myself on the other end of a hammer a lot these days doing our own remodel, or on jobsites helping my clients navigate their renovations. Most days it feels like she’s right there with me. She pushes me to go when I wanna give up, constantly revealing my vision as motivation for when it’s all done. It’s reminding me that with all the different careers I’ve had, and all the things I’ve learned in life, I love to do this work. It's a full circle moment; very much an extension of who I am. It’s familiar. It’s tradition. It’s roots and history. Inherited from her, and her dad before her. I always knew I was supposed to do this. From the age of 6, I was writing stories about being an architect, building houses with legos for hours on end, and playing real estate agent with my brother. I went on every trip my mom took to the paint store. When college came around I had no question what my major would be. I remember my sister telling me that project management was in my DNA, and that paired with my designer brain I was destined to work in this way. After spending decades in corporate careers, I’ve finally come full circle.